BloorIE Refurbishment Abseil’s IRATA trained abseil team conduct glass replacements utilising central lift shaft as access route to central London tower block. In order to conduct these works, our site team utilised a counter-balanced floor crane and suction lifter which was positioned on the floor above the glass replacements. In order to conduct this operation, we required a lift engineer to aide with the operation as the lift needed disabling so the lift shaft could be used as the acce ...